Power transformer testing is essential to ensuring the safety and reliability of electricity transmission networks. The device plays a critical role in these systems, and its failure can bring heavy losses in repair and downtime. In this article, you will learn about the various ways of testing power transformers and the standards that govern the process.

Why is Power Transformer Testing Important?

Power transformers undergo electrical and other stresses in their application environment. Apart from manufacturer tests, regular field checks are crucial to ensure the device continues to operate as expected.

Testing a power transformer helps identify problems before they worsen and cause significant component failure or safety hazards. It reduces power system disruptions considerably and prevents on-site incidents or equipment damage.

Routine tests also prevent unwanted expenses, keeping electricity transmission costs low. That’s because the transformer is an expensive piece of equipment in a power network and one of the most important.

Types of Transformer Testing

A power transformer undergoes many tests: at the factory for acceptance and in the field before and after commissioning. During use, the maintenance team must regularly check its condition and operation. Here is a list of the most crucial testing procedures.

1.Visual Inspection

Visual inspection as a power transformer testing method is inexpensive and straightforward. It catches physical damage, providing early warning signs before the actual tests. Although priorities may vary, the inspections involve the following:

  • Tank condition and if there are leaks or stripped paint
  • The cooling system for visually identifiable anomalies
  • The state of bushings, air breather, and other smaller components like bolts
  • If all gauges and other monitoring instruments are working
  • If all terminations and connections are sound

2.Winding Resistance Test

The winding resistance test measures DC resistance using an ammeter and voltmeter. It also detects contact problems between the windings and other components, such as bushings and tap changers.

  • The windings are charged to saturate the core
  • Current and voltage values are then taken
  • For tapped transformers, measurements are taken for every tap winding
  • Results are compared to those specified for the transformer and variations taken to be winding damage
  • A turn ratio test may also be used to confirm the resistance test results

3.Insulation Resistance Test

The insulation resistance test checks the insulation condition, including that of the bushings. It measures the resistance between the windings and tank (ground) or primary and secondary windings.

  • It begins with short-circuiting the windings with one winding connecting to the test voltage
  • The current flowing through the insulation is then measured on the other winding or the tank
  • A test voltage applied to the principal conductor helps check the bushing. Next, the testing engineer measures the current at the tap
  • Results are compared with previous records
  • The change in capacitance change should not be more than 10%

4.Polarity Test

The polarity test measures the correctness of the current direction. The primary and secondary windings must send current in one direction. If not, the windings are damaged. After establishing the transformer polarity from the markings, the following steps follow.

  • A low voltage is applied to the primary bushings
  • Voltage is then measured across the secondary bushings
  • Repeat this with different combinations. Record the results of each
  • A positive value indicates additive polarity and vice versa
  • Compare results with those of the transformer specifications. The measured polarity should match the specified polarity.

5.Phase Relation Test

This power transformer testing procedure helps detect phase errors. It determines if three-phase transformers connected in parallel will or have been correctly linked together, usually by measuring angular displacement from the 120-degree difference and phase sequence.

  • The winding and phase voltages are measured, and results recorded
  • These are used to calculate the phase relationship between the windings
  • These results are used to determine if the device can step voltage correctly

6.Turns Ratio Test

The turns-ratio test measures the ratio and phase angle between windings to detect open and shorted turns. Using the test results, we can establish if the device can step up the voltage as required.

  • A voltage is applied to the winding phases, one at a time, with the windings grounded
  • For safety reasons, measurements are taken from the HV to the LV windings.
  • Measurements are taken between the high and low-voltage windings
  • The results are checked against specifications. A deviation indicates damage
  • Based on the IEEE standards, the deviation should not exceed ±0.5%

7.Oil Quality Test

The oil plays a cooling and insulation role and must not degrade. Apart from visual inspection tests, various procedures check the oil for contamination. They include water content, acidity, dissolved gas analysis (DGA), and voltage breakdown (BDV) tests.

  • To test for moisture or water content, the Karl Fischer titration process is used
  • The oil sample is compared to water by measuring the relative density of each
  • The acid content test measures the amount of potassium hydroxide required to neutralize an oil sample
  • The DGA test is used to analyze oil samples for the presence of hydrogen, nitrogen, oxygen, carbon monoxide, and other gases
  • The BDV test gradually applies a voltage to an oil sample placed between two electrodes until it reaches the breakdown voltage when arcing occurs
  • This voltage should exceed the recommended value

8.Short Circuit Withstand Test

Short circuits can deform or displace windings. This test aims to assess the windings for this damage by measuring short circuit impedance and reactance as indicated on the nameplate.

  • An AC voltage is applied to the HV side. The other side is left open
  • For single-phase testing, only the corresponding LV winding is shorted
  • For three-phase testing, all phases on the LV side are shorted
  • HV winding current and voltage values are taken in both amplitude and phase
  • The short circuit impedance is calculated using the result values
  • The impedance should not change by more than 3% of the transformer specifications
  • Note that this test does not always show winding deformation, and other tests, such as phase reactance, are necessary before confirming damage

9.Temperature Rise Test

A temperature rise test verifies the transformer’s cooling performance at the rated current. It’s a long process that takes about 12 hours to complete and uses various stages with load and no load steps. The process is also different for oil-cooled and dry transformer types.

  • The low voltage windings are short-circuited
  • Using thermometers, the engineer measures the oil temperature
  • Another set of thermometers placed a short distance away measures ambient temperature
  • A similar voltage is applied to the other windings
  • Temperature readings are recorded and, after that, measured hourly
  • Using the hourly readings, the mean temperature is calculated
  • The results are compared to those specified by the manufacturer

10.Frequency Response Test

The frequency response stray test is identical to short circuit tests. Maintenance engineers mainly use it when conducting advanced routine tests. It measures short circuit impedances at various frequencies to identify overheating due to eddy currents.

  • A voltage is connected to the HV windings phases, one at a time, and the corresponding LV winding shorted
  • The current, voltage, and phase displacement is measured
  • Using the values, the impedance is calculated at 15-400 Hz frequency intervals
  • The results are used to analyze the increase in impedance due to eddy currents
  • The increase should remain constant across phases
  • Deviations show strand-to-strand shorts, which could lead to dangerous overheating

11.Partial Discharge Test

Partial discharge occurs when insulation fails. By performing diagnostic PD tests, it’s possible to tell the defect location in the windings or bushings and take action before things get out of hand.

  • Several acoustic sensors are installed on the tank surface using magnetism
  • These sensors periodically measure the partial discharge from where it occurs to the tank wall

Using the prorogation time and distance, the discharge speed is determined, enabling the testing engineer to identify the problem’s location

Power Transformer Testing Standards

Various national and international standards explain how to check power transformers for damage during routine maintenance. They include IEEE, IEC, and ASTM standards.

For example, the IEEE, or the Institute of Electrical and Electronics Engineers, issues guidelines on the test steps. These standards give essential recommendations:

  • IEEE C57. 12. 00 and IEEE C 57. 12 90 for oil-cooled transformers
  • IEEE C57.12.91 and IEEE C57.12.01 for dry-type transformers.

IEC standards for power transformer testing and maintenance are expressed by IEC 60076 and IEC 600 76-11, among others. Other standards when testing power transformer faults are ASTM for oil quality, NEMA, and ISO.

Conclusion

Power transformer testing is critical to ensuring its proper operation and that of the electrical system using it. As outlined in this article, utility companies and other organizations can reduce the number of downtimes by implementing a proper maintenance regimen for their transmission transformers.